Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Kleen Hy-Dro-Gen Inc. Is Pleased to Announce Dual ISO 9001:2015 and TSSA Certifications, Bolstering Operational Quality and Technical Safety Governance

    August 5, 2026

    OECD inflation falls to 4.2% and energy price pressures cool

    August 5, 2026

    Fuego volcano eruption puts Guatemala regions on red alert

    August 5, 2026
    • Home
    • Contact Us
    Penang HeraldPenang Herald
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Penang HeraldPenang Herald
    Home » First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction
    PR Newswire

    First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction

    October 20, 2023
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email

    BEIJING, Oct. 20, 2023 /PRNewswire/ — JA Solar recently announced that the first phase of its Baotou Manufacturing Base 50MW Rooftop Distributed Photovoltaic (PV) Project has started construction. The project is believed to be an important step in promoting company-wide green production and operations.

    First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction

    With an investment of RMB150 million, the project will be constructed in four phases, and it is expected to be completed by the end of 2023. Installed with JA Solar n-type DeepBlue 4.0 modules, the project is expected to generate 65 million kWh of electricity per year, equivalent to a yearly carbon emission reduction of 54,000 tons. It has been commented by local media that the project will become a model in promoting the application of solar PV in the local area.

    JA Solar always adheres to the concept of sustainable development. JA Solar practices the concept of low-carbon development in its operations, and has built up a green manufacturing ecosystem. As of February 2023, six of JA Solar’s manufacturing bases have been listed in the Ministry of Industry and Information Technology (MIIT)’s “green factories” list. Earlier this year, the n-type products of JA Solar were awarded the carbon footprint PPE2 certification by the French authority Certisolis, which indicates that JA Solar is among the first batch of PV module manufacturers to obtain the French carbon footprint certification under the new PPE2 standard, and demonstrates the low-carbon competitiveness of JA Solar’s n-type products.

    Photo – https://mma.prnewswire.com/media/2252851/image_1.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/first-phase-of-ja-solar-baotou-manufacturing-base-50mw-rooftop-pv-project-starts-construction-301963021.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    TEAM NAVER to establish a joint venture with the National Housing Company in Saudi Arabia, building additional foundations for business along with its digital twin platform

    November 18, 2024

    Mibro Launches Lite3 Pro Smartwatch: The Ideal Work-Life Balance Companion for Urban Professionals

    July 1, 2024

    BRI Unveils Robust Cybersecurity Measures to Safeguard Customer Data

    April 10, 2024

    First BRST Draws Attendees from Over 80 Countries to Boost Science and Tech Collaboration

    November 7, 2023

    Miami International Holdings Reports Trading Results for December and Full-Year 2022; MIAX Exchanges Set Multiple Volume and Market Share Records

    January 9, 2023

    Sarah Otten Joins Medison Pharma as VP, GM Americas Region

    January 9, 2023
    Latest News

    OECD inflation falls to 4.2% and energy price pressures cool

    August 5, 2026

    Fuego volcano eruption puts Guatemala regions on red alert

    August 5, 2026

    Brent and WTI extend losses after sharp crude market selloff

    August 5, 2026

    New Ebola vaccine enters human trial as Congo cases rise

    August 5, 2026
    © 2026 Penang Herald | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.